Back to Blog
How To Knowledge Bank

How App Testing Works Before Launch

By Paul Graf ·

Testing is one of the most important phases of app development — and one of the most commonly rushed. Understanding what testing involves will help you be a better client during this phase and ensure your app launches in a state you’re proud of.

Why Testing Matters So Much

A bug in a TestFlight build affects your small group of testers. A bug in a live App Store app affects every customer who downloads it — and they can leave one-star reviews about it.

App ratings are persistent. A wave of negative reviews from a buggy launch can take months to recover from. And some users who have a bad first experience never come back, even after the app is fixed.

Testing is your insurance policy against all of that.

Types of Testing That Should Happen

Functional testing is the most basic: does every feature work as designed? Can users create accounts? Does the booking system save correctly? Does the payment process complete? This is systematic, feature-by-feature testing.

Device testing checks that the app works on different iPhone models (iPhone 12, 13, 14, 15…), different screen sizes, and different iOS versions. An app that looks great on an iPhone 15 Pro might have layout problems on an older iPhone SE. A developer who only tests on one device is taking a risk.

Performance testing checks how the app behaves under load. Does it slow down when processing a complex operation? Does it handle poor network connectivity gracefully? What happens when the user has 500 items in their order history?

Usability testing is different from technical testing — it focuses on whether real users can figure out how to use the app. This is where having actual customers (not just the developer and the client) try the app is invaluable.

Edge case testing covers the unexpected: What happens when a user enters text where a number is expected? What if they try to book an appointment in a time slot that just became unavailable? What if they lose their internet connection mid-transaction?

What Your Developer Does During Testing

Your developer’s QA process (whether they do it internally or have a dedicated QA tester) should systematically work through every feature and user flow. Good development shops use test cases — written checklists of scenarios to verify — rather than just casually clicking around.

They’ll typically catch the majority of technical bugs in this phase. What they sometimes miss is usability issues: things that technically work but confuse real users. That’s where you come in.

What You’re Expected to Do as the Business Owner

When your developer shares a TestFlight build for client review, your job is to test it as a real customer would — not as someone who helped design it and knows exactly what to do.

Here’s how to approach it:

Test the main flows first. The most important thing is that the core purpose of the app works perfectly. If it’s a booking app, book an appointment. Start to finish, as a new user would.

Try to confuse it. Enter unexpected data. Tap things in the wrong order. Go back when the app expects you to go forward. Leave a transaction half-finished. Real users do all of these things.

Check the content. Are your business name, address, hours, and contact information correct? Is pricing accurate? Are there any spelling errors in the text your developer added?

Test on your real phone. Don’t ask someone to test on their phone and report back to you. Use the device you’ll actually be using.

Write down everything. Keep a running list of every issue you find — no matter how minor. A screenshot with a note attached is ideal.

How Many Rounds of Testing Are Normal?

For a medium-complexity app, expect two to four rounds of testing between the client and the developer. Here’s a typical rhythm:

  1. Developer tests internally and fixes issues they find
  2. You test in TestFlight and report issues
  3. Developer fixes reported issues and pushes a new build
  4. You verify the fixes and test for any new issues
  5. Final sign-off when you’re satisfied

The Launch Readiness Checklist

Before submitting to Apple, make sure:

  • All core features work on at least two different iPhone models
  • All content is accurate and complete
  • Privacy policy is in place and linked in the app
  • App Store listing materials are ready (screenshots, description)
  • Developer accounts are set up
  • You’ve personally gone through every major user flow at least once

Frequently Asked Questions

How long should the testing phase last? For a medium-complexity small business app, two to four weeks of dedicated testing is typical. Rushing this phase is a false economy — the time you save by cutting testing short is often lost to post-launch bug fixes and the reputation damage of a rough launch.

Should I involve my actual customers in testing? Yes, if possible. Invite three to five customers who represent your target user well — people who aren’t especially tech-savvy and won’t be familiar with your app. Watch them use it, or ask them to report their experience. They’ll find usability issues that everyone who’s been involved in building the app has become blind to.

What is a “bug” vs. a “feature request”? A bug is when the app doesn’t work as designed or promised in the scope of work. A feature request is when you want something added or changed that wasn’t in the original spec. Bugs are your developer’s responsibility to fix at no extra cost (within the warranty period). Feature requests are change orders that may have additional cost. If you’re not sure which category something falls into, ask your developer to clarify.

Have questions about your specific project? Graf x Apps offers free consultations — no pressure, just honest advice. Contact us here

Get In Touch

Tell Us About Your Project

Share a few details and we’ll get back to you within one business day.